MacAlpine That application ZBH04/20/JK initiated by the Corporation of the County of Brant, owner of lands described as Plan 81, Block T, Part Lot 6, in the geographic Township of South Dumfries, County of Brant, located at 50 High Street, to amend Zoning By-Law 61-16 by removing the holding provision from the current zoning to allow for a low-rise apartment dwelling consisting of 35 units dedicated to seniors and those with physical disabilities, similar to the existing structure on site, and to provide for the maximum 60 units which was initially proposed on the site, be approved; And that the reasons for the approval of application ZBH04/20/JK are as follows: The proposed changes are consistent with the Planning Act; The proposed changes are consistent with the Provincial Policy Statement (2020), The proposed changes are in conformity with the policies of the Growth Plan for the Greater Golden Horseshoe (2020), The proposed changes are in conformity with the policies of the County of Brant Official Plan (2012), and, The proposed changes are in conformity with the policies of the County of Brant Zoning By-Law 61-16.
Moved by Councillor Wheat
Carried
That application ZBA35/20/AW, received from MHBC Planning on behalf of Gedco Excavating, owner of lands described as Part Lot 20, Concession 1, RP 2R425 Part 2, in the geographic Township of Brantford, County of Brant, and located at 485 Paris Road, to rezone the subject lands from Heavy Industrial (M3) to Heavy Industrial Special Exception (M3-26) to include an aggregate recycling facility as an additional permitted use, be approved with the following site specific provisions: An aggregate recycling facility shall be defined as “means the use of the premises for the recycling, by way of crushing, grinding, blending, and screening, of nonhazardous aggregate by-products such as concrete, asphalt, bricks, glass, and ceramics. This use includes the storage/stockpiling of incoming material awaiting processing and the storage/stockpiling of processed material awaiting shipment. This use does not include a central mixing, batching or any other facility/plant for the production of asphalt and concrete.” That any crushing equipment be located a minimum of 35 metres from each interior side lot line. That any crushing equipment be located a minimum of 25 metres from the rear property line, and within a maximum of 120 metres from the rear lot line. That any stock piles or finished product piles be located a minimum of 25 metres from each interior side yard setback. That any stock piles or finished product piles be located a minimum of 25 metres from the rear property line, and within a
Moved by Councillor Coleman, seconded by Councillor Peirce
That staff report RPT-21-12 be received as information; And that staff be directed to initiate a Zoning By-Law Amendment to Comprehensive Zoning By-Law 61-16 for general housekeeping purposes, being file ZBA01/21/BK, as outlined in staff report RPT-21-12.
Moved by Councillor Chambers, seconded by Mayor Bailey